New Urbandale Police Station
Information about Urbandale’s proposed new police station and the bond referendum.
Originally built in 1982 to serve a community of approximately 18,000 residents, Urbandale’s current Police building no longer meets the operational, safety, technology, training, evidence storage, and space needs of a city that has grown to nearly 50,000 residents.
On November 3, voters will be asked whether the City shall issue up to $25 million in General Obligation Bonds or Capital Loan Notes to fund the design, construction, equipping, and furnishing of a new Police Station. The proposed facility would support the City’s long-term public safety needs while using a building construction financing plan projected to not require an increase in the current property tax debt service levy.
On November 3, Urbandale Voters will be asked:
“Shall the City of Urbandale, State of Iowa, issue its General Obligation Bonds or Capital Loan Notes in an amount not exceeding the amount of $25,000,000 for the purpose of paying costs of designing, constructing, equipping, and furnishing a new police station, with related site improvements?”
Explore the project overview, proposed financing information, and FAQs below, and join us at any of the public information meetings to learn more.
Project at a Glance
Urbandale’s Public Safety Record
Urbandale is a safe community with strong resident confidence in local police services.
Recent public safety indicators show:
- Violent crime is significantly below the national average.
- Property crime is significantly below the national average.
- Urbandale ranks high among peer Iowa cities for safety.
- Resident survey results have consistently shown strong ratings for safety and police services.
- Urbandale Police Department consistently receives positive marks in the community survey, with most residents rating the department as “excellent” or “good” in a wide range of areas.
The proposed building is intended to support the people, training, equipment, and operations that help maintain Urbandale’s high level of public safety service.
In the Community
The Urbandale Police Department does more than respond to emergencies. It partners with schools, engages with residents, supports crime prevention, and provides public safety education. The proposed building will provide the space and resources needed to support these services as Urbandale continues to grow.
Built for Today. Planned for the Future.
Why is the new facility needed?
While the current building has been well maintained, it no longer provides the space, layout or functionality needed to safely and efficiently support daily police operations. Built in 1982 to serve approximately 18,000 residents and 26 officers, the facility was not designed for the operational demands of a city that has grown to nearly 50,000 people and 62 officers.
Over time, the department has adapted the building to meet changing needs. However, it has reached the point where additional remodeling, retrofitting or reconfiguration cannot provide the long-term solutions needed to support modern policing and future growth.
Today, officers, staff, residents, vehicles, equipment, records and evidence all share limited space within a facility that was not designed for current demands. A new police building would provide the space, security and functionality needed to improve operations, enhance public access and ensure the department can continue serving the community safely, efficiently and professionally — now and into the future.
What the New Building Would Include
The proposed Urbandale Police Department building would be about 95,000 square feet and include the spaces and systems needed for modern law enforcement operations, officer readiness, public access, and long-term service delivery.
Safer Public and Secure Areas
The new building would provide better separation between public areas, staff workspaces, secure police operations, temporary detainee processing, and evidence handling.
Secure Vehicle and Equipment Storage
The proposed facility would include enclosed vehicle storage to protect police vehicles, technology, and specialized equipment from weather, damage, and unauthorized access.
Modern Training Space
The proposed building would include updated training areas for defensive tactics, physical readiness, firearms training, crisis response, and other critical skills. A modern training room with updated technology would also allow Urbandale to host regional police training opportunities.
Improved Property and Evidence Storage
The new building would include expanded, secure, and properly designed property and evidence storage, including improved capacity for narcotics, temperature-sensitive items, and large evidence items.
Mental Health, Crisis Intervention, and De-escalation Support
The proposed facility would include dedicated space for Crisis Intervention Team specialists, supporting efforts to de-escalate mental health situations and connect people to appropriate medical or mental health services when possible.
Community-Facing Public Spaces
The building would include welcoming public areas for residents and visitors conducting business, seeking assistance, raising safety concerns, or participating in community policing programs.
Proposed Location: Douglas Avenue and 100th Street
The proposed new building would be located at the southwest corner of Douglas Avenue and 100th Street.
This site was selected because it provides:
- Central access within the community
- East-west access along Douglas Avenue
- North-south access from 100th Street and NW Urbandale Drive
- Connections to I-35/80 and Hickman Road/US-6
- A prominent location along Douglas Avenue
- An opportunity to revitalize a former blighted industrial site
The project is also connected to the City’s broader planning efforts for Douglas Avenue, which serves as an important east-west corridor and “Main Street” connection through Urbandale.
What Would Happen to the Current Police Building?
If the project is approved, the existing Police Department building and site will be evaluated by the City in consultation with architecture and engineering professionals for future public use. The City will determine the best long-term use for the building and site as part of a future planning process.
Will the Nearby Railroad Affect Police Response?
No. Police officers are typically already on patrol throughout the community, and the site provides multiple routes for emergency response. The rail line is used infrequently, and the railroad has begun an early process that may result in abandonment and removal of the line.
More questions?
Check out the Frequently Asked Questions section below.
Planned for the Long Term
The proposed Police Department Building is being designed as a long-term investment in Urbandale’s public safety infrastructure. The facility is planned to serve the community for 40 years or more, while the financing plan is structured to repay project costs in 15 years or less.
The building will use durable, low-maintenance materials and an efficient layout designed to support daily operations, accommodate future growth, and adapt to changes in policing, technology, and community needs. It will also provide secure storage for vehicles, equipment, property, and evidence. Throughout the project, the City plans to use professional construction management and competitive bidding to help keep construction on schedule and within budget.
The goal is to make this investment once and build a building that will effectively serve Urbandale for decades to come.
Sustainable Building Design
Planned sustainability features include:
- Geothermal heating and cooling
- Energy-efficient lighting and HVAC systems
- Solar-ready electrical systems
- Native landscaping
- Modern stormwater management
- Bicycle accommodations
- Electric vehicle charging accommodations
These features are intended to reduce long-term operating costs and support the City’s sustainability goals.
Project Timeline
July 7
August 3
August 3
November 3
Fall 2028
How This Project Would Be Funded
Total Project Estimated Cost: $60 million
The proposed facility is designed to serve the community for 40 years or more and is structured to be fully paid for in 15 years or less.
Would My Property Tax Rate Increase for This Project?
No, not under the City’s projected financing plan. The proposed financing is structured so the police facility would not require an increase in the City’s current debt service property tax levy.
Urbandale has strategically used funds from LOSST (Local Option Sales and Service Tax) over the past several years to help make this project more affordable. The City has also identified revenue from the TIF district covering the Urban Loop commercial area to help pay over 40% of the borrowing cost.
Voting Information
The bond referendum will appear on the Tuesday, November 3, 2026 ballot. Referendum questions are usually at the end of the ballot, possibly at the end of the second page/back side. To vote on the question, you may need to turn your ballot over.
Urbandale residents can find information about voter registration, polling locations, absentee voting, and election deadlines through the Polk County Auditor’s Office and Dallas County Auditor’s Office, depending on where they live.
Find your polling place
Register to Vote
Absentee Voting Information
Read the Ballot Question
Behind the Badge
Go behind the scenes with Urbandale Public Safety and meet the people whose professionalism, compassion, and commitment help make Urbandale a community we’re proud to call home.
Urbandale's Crisis Intervention Team: Dedication to Mental Health Support
Answering the Call: A Look into Urbandale's Public Safety
Capturing the Excitement of Urbandale's National Night Out
Urbandale Residents "Run For The Badge" at Annual Event
Frequently asked questions
Will my property tax rate go up because of this project?
No, not under the City’s projected financing plan. The proposed financing is structured so the police facility would not require an increase in the City’s current debt service property tax levy.
The proposed borrowing of up to $25 million for the police facility would be repaid over approximately 15 years. Payments would be coordinated with the City’s existing debt schedule as older bonds are paid off. Based on current taxable property values and financing assumptions, the City projects that the police station can be funded while keeping the debt service levy at its current rate. (The City’s debt service levy is currently $1.34 per $1,000 of taxable property value. The City’s latest audited financial statements reported approximately $50.2 million in outstanding general obligation bonds as of June 30, 2025.)
Urbandale has strategically used revenue from the Local Option Sales and Services Tax, or LOSST, to retire debt early and create room within its existing financing plan. The City has also identified revenue from the TIF district covering the Urban Loop commercial area to pay more than 40% of the project’s borrowing costs.
This projection is based on current property values, interest-rate estimates and financing assumptions for the City’s share of your tax bill. A property owner’s final tax bill may still change because of differences in taxable value or tax rates established by other taxing authorities (for example: school districts, counties, etc.).
The City Clerk is required to publish a notice of the Council action in calling for an election on the bond issuance which includes this sentence: “The annual increase in property taxes as the result of the issuance on a residential property with an actual value of one hundred thousand dollars is estimated not to exceed $20.93.” For clarification, it is very important to note that this calculation and language is required by Iowa Code to meet the form of notice dictated in the Code. However, there is no tax levy increase proposed in conjunction with this project. The reference to an annual increase of $20.93 on a $100,000 residential valuation is a hypothetical example if a debt service levy increase would be needed to service the debt. This is not the case. City staff are proposing a financing plan that allows this general obligation debt issuance to be serviced with existing capacity provided by the current debt service levy of $1.34.
Why can’t the current police station be renovated or expanded?
The existing building is more than 40 years old and has already been expanded or remodeled several times. The current site does not provide adequate room to address the Department’s operational, training, security, evidence storage, vehicle storage, and future growth needs.
The City has determined in consultation with architects that there is not a fiscally responsible renovation or expansion option that would create the facilities needed at the current site.
Why does Urbandale need a new police building?
The current Police Department building was originally constructed in 1982, when Urbandale had approximately 18,000 residents. Urbandale now has nearly 50,000 residents, and the facility no longer meets the needs of a modern police department serving a growing community.
The current building has limited space for staff, training, evidence storage, vehicles, equipment, secure operations, and public access. The facility has been expanded and remodeled several times, but the City has determined that the building and site cannot meet the department’s current and long-term needs.
Where would the new building be located?
The proposed new Police Department building would be located at the southwest corner of Douglas Avenue and 100th Street.
Why was that site selected?
The City already owns this property, which means the project could move forward without the added cost of acquiring land. The site provides central access within Urbandale, east-west access along Douglas Avenue, north-south access from 100th Street and NW Urbandale Drive, and connections to I-35/80 and Hickman Road/US-6. The project would also bring new life to a former blighted industrial site in a highly prominent location along Douglas Avenue.
Would the new location affect response times?
The City expects that response times would be similar or improved. Police vehicles and officers are typically out in the community on patrol rather than stationed at the building. The proposed location is centrally positioned and provides access to multiple major routes.
The new facility would also support vehicle, equipment, and officer readiness, helping ensure resources are prepared for service.
Will the railroad tracks near the proposed site impact response times?
No. The railroad tracks are not expected to impact response times. The site has strong access in multiple directions, and police officers are typically already on patrol throughout the community, allowing them to respond from multiple locations.
Separately, on July 31, 2026, the federal Surface Transportation Board approved a petition to abandon the rail line, known as the “Grimes Line.” The railroad is expected to discontinue service on the line, with removal of the tracks anticipated in the future.
How much would the project cost?
The total estimated project cost is $60 million. The proposed financing plan includes $10 million in cash, Local Option Sales and Service Tax funds, and reserves; $25 million in bond funding paid with revenue from the Urban Loop area TIF district; and $25 million in voter-approved bond funding.
Can you explain the project financing in the simplest terms possible?
The explanation below is extremely simplified and does not address the many variables or intricacies of public financing. However, it’s provided to give a very basic overview of the project financing.
The project is estimated at $60 million.
Cash the City has on hand, or will receive in the near future, would pay for about $10 million of the project. This would be like a “down payment” on a home mortgage.
Another $25 million would come from tax increment financing (TIF). TIF is a public financing method in which a city can utilize property tax revenue generated from property value growth within a defined area to benefit that area. In this case, the proposed police station is within the TIF district that covers most of the business areas along Interstate 35/80. The City plans to collect about $25 million from this district to service a short-term (five years or less) borrowing, and reinvest it directly into the construction of the new police station
The final $25 million is the subject of the bond referendum. This is basically a 15-year loan and it is a very common method used to finance a large civic project. If this were a home purchase, this is like the mortgage.
Similar to a homeowner planning around their existing mortgage and income, the City has also planned this borrowing around other debt that is being paid off. Under the City’s projected financing plan, the New Urbandale Police Station can be paid for within 15 years without increasing the City’s current debt service property tax levy.
What exactly does the referendum authorize?
The referendum asks whether the City may issue up to $25 million in General Obligation Bonds or Capital Loan Notes for the purpose of paying costs of designing, constructing, equipping, and furnishing a new police station, with related site improvements.
What would happen if the sixty percent bond referendum approval threshold is not met?
The Police Department would need to continue operating in the current station. However, the inadequacies of the current station will worsen with time and cannot efficiently be addressed in the current building or on the current site. If the referendum does not pass, the City would need to undergo a re-assessment of options.
When would the new police building open?
If approved, and if construction proceeds without major weather or material delays, the new Police Department building is expected to open in fall 2028.
Why is a firearms training range included?
The firearms training range in the current building is inadequate, far undersized, and ventilation does not meet modern standards. Police officers must undergo continuous training to prepare for high-risk situations. A modern firearms training range would enable Urbandale officers to train more safely and frequently in realistic environments, eliminating dependence on external facilities. The range is designed to enhance officer preparedness, promote the preservation of life, and ensure safe responses during critical incidents.
Would the building include space for mental health and crisis response?
Yes. The planned facility will provide a designated area for the mental health Crisis Intervention Team, facilitating effective de-escalation strategies and ensuring individuals facing mental health challenges are connected with appropriate medical or mental health care.
Would the new building include public spaces?
Yes. The proposed building would include public-facing spaces for residents and visitors conducting business with the Police Department, seeking assistance, raising safety concerns, or participating in community policing programs.
What would happen to the existing police station?
The existing police station is located within the City Campus area and could have a number of potential future public uses. However, it would be premature to make specific plans for the property before the outcome of the referendum is known. If the referendum is approved and a new police facility is constructed, the City would evaluate the existing building and site to determine how to best serve the community in the future.
In 2025 and early 2026, the Police Station replacement project was estimated at 74,000 square feet and about $52 million. It is now estimated at 95,000 square feet and $60 million. Why is that the case?
Early planning studies did estimate a need of about 74,000 square feet for a replacement police station. By their nature, these are high-level planning studies and rely on additional work before a final plan can be considered. In late 2025 and early 2026, the City Council hired an owner’s agent, architect, and construction manager for this public building project. The professionals developed plans and estimates based on an in-depth analysis of the Police Department’s needs to accommodate growth for at least 40 years. While the building is designed to be efficient and cost-effective, additional floor area is required to accommodate current and future needs of a core service department in a growing community.
The initial budget for the project was based on a needs study that anticipated accommodating growth for 30 years and a construction start date of 2025. The new budget is based on refined design informed by the professional work over the last 7+ months, 40-year growth which provides additional service years to the community, and an anticipated start date in 2027 which reflects increased construction costs. This is a total project cost estimate which includes all “soft” costs like professional fees, furniture, fixtures & equipment, etc.
What would the impact of this building be on the City’s operating budget?
The City recognizes that a larger building will require additional maintenance costs. As the final design of the building isn’t yet complete, an accurate annual building operating cost cannot be calculated yet. Pending anticipated completion in fall 2028, operating costs would be refined and included in the fiscal year 2029 (7/1/2028 – 6/30/2029) budget. However, there are built-in efficiencies in the building such as geothermal heating and cooling, efficient lighting, and daylighting which mitigate costs. A larger building does not require or mean that many new people will be hired. The Department’s growth is expected to generally track that of the City over time. The addition of this building is not expected to impact the property tax rate.
Why not build the new Police Station on the City campus at 86th Street and Douglas Avenue?
Building on the campus was thoroughly evaluated by architects and engineers. The location of other public facilities like the Urbandale Water Utility and the sloping topography of the site presented constraints that the open site at the southwest corner of 100th Street and Douglas Avenue do not.
It is also important to note that constructing the new Police Station on the existing site would have required a relocation of the Urbandale Police Department to an alternate site through the construction process. Building at the proposed new location allows the Department to continue operating and then make an orderly transition to a new Police Station, avoiding the costs and operational disruption of a temporary relocation.
Can someone from the City speak to my group about the project?
Yes. City staff are available to provide informational presentations about the proposed Police Department building and November 3 bond referendum. If your neighborhood association, HOA, service club, business, community organization, or other group would like to learn more, we can come to one of your meetings to explain the project, walk through the proposed facility and financing plan, and answer questions. Interested in scheduling a presentation? Click here.
Will Urbandale continue to grow? Isn’t the city landlocked?
Urbandale is not landlocked and has options to continue to grow within its current boundaries and through thoughtful, planned annexation. The City has been growing steadily by about 600 people per year for decades and the Community Development Department estimates the city population could reach 65,000 by 2050. A growing population and growing city geography will require additional police services, as well.
Will the new station provide for the electric charging of potential electric police vehicles?
Yes, the proposed new police station’s electrical system is being designed to accommodate electric vehicle charging. A contingency is also made for guest vehicle charging. The building is designed for 40+ years of growth, so anticipating future police fleet changes and visitor needs is important.
How does the proposed Urbandale police station compare to other police stations recently built in the Des Moines Area?
While the needs of each community and police department are unique, making apples-to-apples comparison difficult, Urbandale’s proposed police station is in line with other Metro facilities when comparing current and future population growth, current and future employee counts, and the inclusion of training ranges and built-in expansion space.
The City of Altoona (population 22,796) built a 60,000 square foot combined police/city hall building and long-term community and department growth could require expansion into city hall space. The City of Clive (population 19,861) built a 25,000 square foot combined police/fire building with no training range. Clive’s city boundaries limit future growth. The City of Waukee (population 34,890) built an 80,000 square foot combined police/fire building with no training range. It is important to note these three facilities plan for 20-year growth.
The City of Urbandale (population 48,570) is proposing a 94,943 square foot building that will accommodate 40+ years of growth with no physical expansion and includes a training range. Urbandale is currently projected to grow to 65,000 people by 2050 and typically adds around 600 people per year, requiring additional police officers to maintain adequate officer to population ratios over time.
Can I view the presentation about the proposed Police Station?
Yes. The City has developed a presentation that provides an overview of the proposed Police Station project, including why a new facility is being considered, the proposed location and size, how the project would be funded, and what the bond referendum would mean for residents. You can view the presentation here.
How will the new Urbandale Police Station compare to Altoona's?
The new Urbandale Police Station is being designed as a modern facility that incorporates current technology and best practices in law enforcement. As part of the planning process, our team toured Altoona’s police station and incorporated many of its successful design elements. While Altoona served as a valuable reference, Urbandale’s facility is being designed specifically to meet the needs of our Police Department and the community we serve. Throughout the design process, we’ve focused on balancing the technology, safety features, and operational needs of a modern police department with responsible stewardship of taxpayer dollars.
Could the City increase sales taxes to cover cost overruns on the new Police Station?
No. The sales tax revenue included in the Police Station financing plan comes from Urbandale’s existing 1% Local Option Sales and Services Tax (LOSST), not a new or increased sales tax.
Iowa law limits the Local Option Sales and Services Tax to 1%, which is already in effect in Urbandale. The City has no plans to increase sales taxes to fund the new Police Station, including to cover potential cost overruns.
If project costs exceed initial estimates, the City would evaluate its options for managing those additional expenses.
Submit a question not currently listed in the FAQs...
If you do not see your question addressed above, you can submit your questions here. City staff will review submitted questions and use them to help clarify project information and update the FAQs when appropriate. You can also contact Urbandale’s Police Chief Rob Johansen at 515-278-3938, or the City Manager’s Office (David Jones or Curtis Brown) at 515-278-3900.