New Urbandale Police Station

OPN rendering - cut out of the Police Building

The City of Urbandale is providing information about the proposed new police station and the bond referendum that would appear on the November 3 ballot.

Originally built in 1982 to serve a community of approximately 18,000 residents, Urbandale’s current Police building no longer meets the operational, safety, technology, training, evidence storage, and space needs of a city that has grown to nearly 50,000 residents.

On November 3, voters will be asked whether the City shall issue up to $25 million in General Obligation Bonds or Capital Loan Notes to fund the design, construction, equipping, and furnishing of a new Police Station. The proposed facility would support the City’s long-term public safety needs while using a building construction financing plan projected to not require an increase in the current property tax debt service levy. 

Urbandale Police Department badge showing an eagle and a banner that says Integreity
BALLOT QUESTION

“Shall the City of Urbandale, State of Iowa, issue its General Obligation Bonds or Capital Loan Notes in an amount not exceeding the amount of $25,000,000 for the purpose of paying costs of designing, constructing, equipping, and furnishing a new police station, with related site improvements?”

PUBLIC INFORMATION MEETINGS

Explore the project overview, proposed financing information, and FAQs below, and join us at any of the public information meetings to learn more.

Tuesday, September 29
Urbandale Public Library at 7:00 PM
Thursday, October 1
Walnut Hills Elementary School at 5:30 PM
Saturday, October 3
Urbandale Senior Recreation Center at 9:00 AM
Can’t make a public meeting?
Request a presentation. We’ll come to you.
OVERVIEW

Proposed facility:

New building for the Urbandale Police Department

Proposed location:

Southwest corner of Douglas Avenue and 100th Street

Estimated project cost:

$60 million

Referendum amount:

Up to $25 million

Planned opening:

Fall 2028, if approved and if construction proceeds without major delays

Expected service life:

The building has been designed to allow for growth of the department for 40 years or more

Tax impact:

The City’s financing plan is designed so the building project would not require an increase to the property tax levy

Financing term:

Project paid off in 15 years or less
SERVING A GROWING COMMUNITY

Urbandale is a safe community with strong resident confidence in local police services. 

Recent public safety indicators show:

  • Violent crime is significantly below the national average. 
  • Property crime is significantly below the national average. 
  • Urbandale ranks high among peer Iowa cities for safety. 
  • Resident survey results have consistently shown strong ratings for safety and police services. 
  • Urbandale Police Department consistently receives positive marks in the community survey, with most residents rating the department as “excellent” or “good” in a wide range of areas.

The proposed building is intended to support the people, training, equipment, and operations that help maintain Urbandale’s high level of public safety service. 

The Urbandale Police Department does more than respond to emergencies. It partners with schools, engages with residents, supports crime prevention, and provides public safety education. The proposed building will provide the space and resources needed to support these services as Urbandale continues to grow.

FACILITY
WHY NOW?

While the current building has been well maintained, it no longer provides the space, layout or functionality needed to safely and efficiently support daily police operations. Built in 1982 to serve approximately 18,000 residents and 26 officers, the facility was not designed for the operational demands of a city that has grown to nearly 50,000 people and 62 officers.

Over time, the department has adapted the building to meet changing needs. However, it has reached the point where additional remodeling, retrofitting or reconfiguration cannot provide the long-term solutions needed to support modern policing and future growth.

Today, officers, staff, residents, vehicles, equipment, records and evidence all share limited space within a facility that was not designed for current demands. A new police building would provide the space, security and functionality needed to improve operations, enhance public access and ensure the department can continue serving the community safely, efficiently and professionally — now and into the future.

FACILITY

The proposed Urbandale Police Department building would be about 95,000 square feet and include the spaces and systems needed for modern law enforcement operations, officer readiness, public access, and long-term service delivery. 

Rendering of bathrooms

Safer Public and Secure Areas

The new building would provide better separation between public areas, staff workspaces, secure police operations, temporary detainee processing, and evidence handling.  

Secure Vehicle and Equipment Storage

The proposed facility would include enclosed vehicle storage to protect police vehicles, technology, and specialized equipment from weather, damage, and unauthorized access. 

rendering of workstations in office building

Modern Training Space

The proposed building would include updated training areas for defensive tactics, physical readiness, firearms training, crisis response, and other critical skills. A modern training room with updated technology would also allow Urbandale to host regional police training opportunities. 

Improved Property and Evidence Storage

The new building would include expanded, secure, and properly designed property and evidence storage, including improved capacity for narcotics, temperature-sensitive items, and large evidence items. 

Mental Health, Crisis Intervention, and De-escalation Support 

The proposed facility would include dedicated space for Crisis Intervention Team specialists, supporting efforts to de-escalate mental health situations and connect people to appropriate medical or mental health services when possible. 

Community-Facing Public Spaces

The building would include welcoming public areas for residents and visitors conducting business, seeking assistance, raising safety concerns, or participating in community policing programs. 

LOCATION

The proposed new building would be located at the southwest corner of Douglas Avenue and 100th Street. 

This site was selected because it provides: 

  • Central access within the community 
  • East-west access along Douglas Avenue 
  • North-south access from 100th Street and NW Urbandale Drive 
  • Connections to I-35/80 and Hickman Road/US-6 
  • A prominent location along Douglas Avenue 
  • An opportunity to revitalize a former blighted industrial site

The project is also connected to the City’s broader planning efforts for Douglas Avenue, which serves as an important east-west corridor and “Main Street” connection through Urbandale. 

What Would Happen to the Current Police Building?

If the project is approved, the existing Police Department building and site will be evaluated by the City in consultation with architecture and engineering professionals for future public use. The City will determine the best long-term use for the building and site as part of a future planning process. 

Will the Nearby Railroad Affect Police Response?

No. Police officers are typically already on patrol throughout the community, and the site provides multiple routes for emergency response. The rail line is used infrequently, and the railroad has begun an early process that may result in abandonment and removal of the line. 

More questions?

Check out the Frequently Asked Questions section below.

RESPONSIBLE & SUSTAINABLE

The proposed Police Department Building is being designed as a long-term investment in Urbandale’s public safety infrastructure. The facility is planned to serve the community for 40 years or more, while the financing plan is structured to repay project costs in 15 years or less.

The building will use durable, low-maintenance materials and an efficient layout designed to support daily operations, accommodate future growth, and adapt to changes in policing, technology, and community needs. It will also provide secure storage for vehicles, equipment, property, and evidence. Throughout the project, the City plans to use professional construction management and competitive bidding to help keep construction on schedule and within budget.

The goal is to make this investment once and build a building that will effectively serve Urbandale for decades to come.

The proposed station is being designed with durability, efficiency, and environmental responsibility in mind. 

Planned sustainability features include: 

  • Geothermal heating and cooling
  • Energy-efficient lighting and HVAC systems
  • Solar-ready electrical systems
  • Native landscaping
  • Modern stormwater management
  • Bicycle accommodations
  • Electric vehicle charging accommodations

These features are intended to reduce long-term operating costs and support the City’s sustainability goals. 

PROPOSED TIMELINE
Rendering of the proposed New Police Department

July 7

Set public hearing for Urban Renewal Plan amendment

August 3

Public hearing to consider Urban Renewal Plan amendment

August 3

City Council consideration of ballot language

November 3

Bond Referendum Vote

Fall 2028

Estimated opening of new Police Department building, if approved and if construction proceeds without major delays.
FINANCING

Bond referendum

$25 million

This portion of the financing plan would be subject to voter approval on November 3. If approved, this funding is planned to be paid off in 15 years or less.

LOSST & City reserves

$10 million

Over the past two years, the City has prepared for this potential project; allocating a portion of Local Option Sales and Service Tax (LOSST) revenue and cash reserves to help cover the costs. Think of these funds like a "down payment" that the City has been saving to help reduce the overall amount of money that the City needs to borrow.

TIF revenue

$25 million

Revenue from the City’s Northwest Market Center (Urban Loop) tax increment financing (TIF) district is expected to pay over 40% of the project cost. This bond would be paid off in 15 years or less.

Total Project Estimated Cost: $60 million

Police Department Funding Sources

Total Project Funding $60 Million
$25 MillionSubject to Voter Approval
$10 MillionCash, Local Option Sales & Service Tax Funds
$25 MillionTIF Revenue Funding
Officers in front of Police car
PROPERTY TAX IMPACT

No, not under the City’s projected financing plan. The proposed financing is structured so the police facility would not require an increase in the City’s current debt service property tax levy.

Urbandale has strategically used funds from LOSST (Local Option Sales and Service Tax) over the past several years to help make this project more affordable. The City has also identified revenue from the TIF district covering the Urban Loop commercial area to help pay over 40% of the borrowing cost. 

VOTE

The bond referendum will appear on the Tuesday, November 3, 2026 ballot. Referendum questions are usually at the end of the ballot, possibly at the end of the second page/back side. To vote on the question, you may need to turn your ballot over.

Urbandale residents can find information about voter registration, polling locations, absentee voting, and election deadlines through the Polk County Auditor’s Office and Dallas County Auditor’s Office, depending on where they live. 

THE PEOPLE

Go behind the scenes with Urbandale Public Safety and meet the people whose professionalism, compassion, and commitment help make Urbandale a community we’re proud to call home.

Urbandale's Crisis Intervention Team: Dedication to Mental Health Support
Answering the Call: A Look into Urbandale's Public Safety
Capturing the Excitement of Urbandale's National Night Out
Urbandale Residents "Run For The Badge" at Annual Event
FAQs

Will my property tax rate go up because of this project?

Why can’t the current police station be renovated or expanded?

Why does Urbandale need a new police building?

Where would the new building be located?

Why was that site selected?

Would the new location affect response times?

Will the railroad tracks near the proposed site impact response times?

How much would the project cost?

Can you explain the project financing in the simplest terms possible?

What exactly does the referendum authorize?

What would happen if the sixty percent bond referendum approval threshold is not met?

When would the new police building open?

Why is a firearms training range included?

Would the building include space for mental health and crisis response?

Would the new building include public spaces?

What would happen to the existing police station?

In 2025 and early 2026, the Police Station replacement project was estimated at 74,000 square feet and about $52 million. It is now estimated at 95,000 square feet and $60 million. Why is that the case?

What would the impact of this building be on the City’s operating budget?

Why not build the new Police Station on the City campus at 86th Street and Douglas Avenue?

Can someone from the City speak to my group about the project?

Will Urbandale continue to grow? Isn’t the city landlocked?

Will the new station provide for the electric charging of potential electric police vehicles?

How does the proposed Urbandale police station compare to other police stations recently built in the Des Moines Area?

Can I view the presentation about the proposed Police Station?

How will the new Urbandale Police Station compare to Altoona's?

Could the City increase sales taxes to cover cost overruns on the new Police Station?